More cooling, less downtime.

Selected rehabilitation, upgrade and emergency projects for energy producers and large campuses in Saudi Arabia and Bahrain.

15 years
of cooling tower projects across Saudi Arabia
+42%
cooling capacity from an existing concrete tower
+25%
capacity in the same footprint
Zero
unit shutdowns during a tower replacement

Capacity results are project outcomes from individual tower upgrades; results depend on the tower, its duty and operating conditions.

Featured project

Replaced at 23 metres — without stopping the unit.

The original wooden crossflow cooling towerBefore
Al Kanar team at handover of the new non-metallic cooling towerAt handover
Wooden crossflow tower replaced with a non-metallic FRP counterflow tower at a gas plant sulphur export unit.

A wooden crossflow tower had reached the end of its life on a unit that could not be taken offline.

Replaced it with a non-metallic FRP counterflow tower at 23 m basin level, while a temporary system — cooling tower, plate heat exchanger and circulation pumps — kept the unit running.

  • No unit shutdown
  • Work at 23 m basin level under strict safety controls
  • Temporary tower, plate heat exchanger and pumps supplied and run by our team

More projects

Rehabilitation, upgrades and emergency response.

Wood to FRPcomplete structure

NGL plant · Abqaiq

Wet-section structure upgrade

Problem The wooden structure of a combined cooler’s wet section, including its hot-water basin, had deteriorated.

Scope Replaced the complete wooden structure and hot-water basin with FRP sections.

Result Wood to FRP, complete structure

Emergency fan blade repair

Power plant · Bahrain

Emergency fan blade repair

Problem FRP fan blades across a bank of cooling tower fans were damaged and needed urgent repair.

Scope Repaired the FRP blades on all affected fans on an emergency basis.

Result 16 fans repaired on emergency call-out

+25% capacitysame footprint

Hospital cooling plant · Al-Ahsa

Wooden tower to FRP counterflow

Problem An ageing wooden crossflow tower needed replacing without interrupting hospital cooling.

Scope Replaced it with an FRP counterflow tower on the existing basin, using a temporary tower during the changeover.

Result +25% capacity, same footprint

+42% capacitysame structure

Medical city · Riyadh

Concrete tower upgrade

Problem More cooling capacity was needed from an existing concrete cooling tower.

Scope Replaced the tile fill with high-performance grid fill inside the same concrete structure.

Result +42% capacity, same structure

Concrete cooling tower — design and supply

University IT centre · Eastern Province

Concrete cooling tower — design and supply

Problem A new concrete cooling tower was required for a university IT facility.

Scope Designed and supplied the tower, including its civil structural design and ceramic tile fill.

Result Design to supply, including civil